* Obsidian
Trinity Way, Greengate, Salford, Greater Manchester, Manchester · M3 7GW
Developed by Salboy
A 26-storey tower of 250 apartments on Trinity Way in Greengate — Salboy’s tenth Manchester development, built with DOMIS and designed by Studio Power. Mix of 31 studios, 93 one-bed, 111 two-bed and 15 three-bed. Amenities include private dining, gym, cinema room and coworking. Completion expected Q4 2026. Seeded 6 Aug 2026 from public sources: placenorthwest.co.uk, constructionenquirer.com, prnewswire.co.uk, search.savills.com. Figures not found in a source were left blank rather than estimated. Review and remove the leading asterisk once verified.
Costs & tenure
Service charge is set once per development in £/sq ft/year; each unit’s charge scales with its floor area.